Tri-Schools Road Project

The Tri-Schools Road Project is dedicated to improving street and sidewalk needs in the area of three Mansfield ISD schools: Carol Holt Elementary School, Cross Timbers Intermediate School and T.A Howard Middle School. Calender Road, Ledbetter Road and Russell Road are narrow, two-lane asphalt roadways with ditch drainage and limited sidewalks, making the area unsafe for children who walk to school. Residents in the area petitioned for the project, which has been developed with community input, including five City of Arlington sponsored neighborhood meetings on 05/29/2014, 04/08/2013, 09/17/2012, 05/21/2012 and 09/20/2011.

The Tri-Schools Road Project construction, a multi-million dollar project began construction on June 9, 2014.

Project Improvements

The following roads will be reconstructed as reinforced concrete streets with curbs and sidewalks: Ledbetter between Curry Road & Russell Road, Russell between Ledbetter Road and Calender Road, and Calender between Monthaven Road to Harris Road. The project includes the replacement of water lines on these streets. Sanitary sewer mains are also being replaced and installed to provide city sanitary sewer services to all properties abutting these streets. Underground storm drainage and street lighting will also be installed as part of the improvements.

In order to alleviate this congestion, improvements will widen portions of the roadways and install design improvements to key intersections that will enhance traffic flow during peak hours. Additional design considerations include enhanced safety features, such as expanded sidewalks, crosswalks and designated lanes for bicyclists on Calender Lane.

Improvements include the installation of a traffic roundabout at the intersection of Russell Road and Calender Road, and at the intersection of Calender Road and Harris Road.

Curry Road, between Winthorp Drive and Blake Drive, will be reconstructed at a lower elevation to remove a limited site distance condition at Ledbetter Road.

Storm Drainage improvements and sanitary sewer improvements are also included on Blue Forest Drive between Ledbetter Road and Forest Mist Drive. Asphalt street resurfacing of Blue Forest Road between Harris Road and Ledbetter Road is also included in the project.

Finally, a sanitary sewer line upgrade on Truver Lane is also included in the project. The impacted pavement surface on Truver Lane will be restored as part of the project.

City of Arlington

    • Bob Watson, Project Manager, 817-459-6582
    • James Essenmacher, Construction Superintendent 817-459-6540
    • Marvin Cottongame, Construction Inspector 817-459-6540
    • After hour construction emergency 817-459-5900

General Contractor Jackson Construction, LTD.

    • Phillip Pfeffer, Construction Superintendent 817-572-3303

Construction Hours

Construction activities are normally restricted to 7:00 a.m. to 8:00 p.m. Monday thru Saturday.  Some construction activities such as certain water line main repair may take place after hours.  Please contact Steve Schell with any concerns related to after-hours work construction operations, or contact The Arlington Police Department   817-459-5600.

Construction Update – January 2016

The Tri-Schools Street Improvements Project is wrapping up the major construction activities at this time. The contractor anticipates completing all major roadway work by early March and will open roads to two way traffic five months ahead of schedule. Minor lane closures, during working hours, can be expected to continue through April. The following video is provided to answer general questions regarding roundabouts. If you have further questions please contact Bob Watson at 814-459-6582.

Modern Roundabouts – A Safer Choice Video (FHWA)

The Harris Road extension from Calender Road to the west is scheduled to begin later this month. Calender Road shall remain open to traffic during this process. The work includes extending a 42-inch water line the entire length of Harris Road between Ledbetter Road and Calender Road. This additional work will not extend the time provided to complete the original scope of work. The contractor will continue to work on the original project until all bid items are substantially complete.

click images to enlarge

Tri-schools - Roundabout Opening Announcement

Construction Detour

Ending March 2016
Tri-School-Streets-Improvement-Construction-Detour-Beginning-4-24-2015-Map-Phase-2

Meetings, Reports, and Updates

05/29/2014 – Public Meeting #5

The City of Arlington will be hosting a meeting about the Tri-Schools Street Improvements project on Thursday, May 29, 2014 at 7:00pm. The meeting will be at Carol Holt Elementary School located at 7321 Ledbetter Road, Arlington, TX 76001.
Meeting Notice created on 05/15/2013

04/08/2013 – Public Meeting #4

ROW Acquisition and Construction Sequencing
Meeting Notice created on 04/02/2013

09/17/2012 – Public Meeting #3

The City of Arlington will be hosting a meeting about the Tri-Schools Street Improvements project on Tuesday, September 20, 2011 at 7:00pm. The meeting will be at Cross Timbers Intermediate school located at 2934 Russell Road, Arlington, TX 76001.
Meeting Notice created on 09/16/2012
Comment Cards/Questions and Answers created on 02/06/2013

05/21/2012 – Public Meeting #2

The City of Arlington will be hosting a 2nd Public meeting about the Tri-Schools Street Improvements project on Monday, May 21, 2012 at 7:00pm. The meeting will be at Cross Timbers Intermediate school located at 2934 Russell Road, Arlington, TX 76001.
Comment Cards/Questions and Answers created on 09/17/2012

09/20/2011 – Public Meeting #1

The City of Arlington will be hosting a meeting about the Tri-Schools Street Improvements project on Tuesday, September 20, 2011 at 7:00pm. The meeting will be at Cross Timbers Intermediate school located at 2934 Russell Road, Arlington, TX 76001.
Meeting Notice created on 09/08/2011
Comment Cards/Questions and Answers created on 11/02/2011